You don't have javascript enabled. Good luck with that.
Pencarian
Hari Ini, Kereta LRT Diuji Coba Fungsional

Two LRT Trains Functionally Trialled

Through PT Light Rail Transit (LRT) Jakarta, the city-owned construction company PT Jakarta Propertindo (Jakpro) is conducting the first functional trial towards two trains, Wednesday (8/15).

Today two trains are trialled with a distance of 5.8 kilometers, from Velodrome Station

PT LRT Jakarta CEO, Allan Tandiono disclosed that it is conducted with a limited number of passengers, which are 100 people by traveling the Velodrome Station, Rawamangun, East Jakarta to the Boulevard Utara Station in Kelapa Gading Mall, North Jakarta.

"Today two trains are trialed with a distance of 5.8 kilometers, from Velodrome Station, Rawamangun to Boulevard Utara Station, Kelapa Gading Mall," he stated, Wednesday (8/15).

LRT will Be Trialled on August 15

In its trial, the train is controlled by the machinists with a maximum speed of 40 kilometers per hour on a straight track and 25 kilometers per hour on a cornering track.

Linked News
Popular News indeks
  1. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye853 personFakhrizal Fakhri
  2. Ancol Offers Free Entry for Three Days

    access_time13-06-2026 remove_red_eye408 personAnita Karyati
  3. South Jakarta Strengthens Efforts to Boost Regional Tax Revenue

    access_time15-06-2026 remove_red_eye352 personTiyo Surya Sakti
  4. Education Agency: Student Admissions to be Objective, Transparent, and Inclusive

    access_time15-06-2026 remove_red_eye346 personAldi Geri Lumban Tobing
  5. 54 Vehicles Undergo Free Emissions Testing at Mitra Praja Sunter

    access_time15-06-2026 remove_red_eye341 personAnita Karyati