You don't have javascript enabled. Good luck with that.
Pencarian
Hari Ini, Kereta LRT Diuji Coba Fungsional

Two LRT Trains Functionally Trialled

Through PT Light Rail Transit (LRT) Jakarta, the city-owned construction company PT Jakarta Propertindo (Jakpro) is conducting the first functional trial towards two trains, Wednesday (8/15).

Today two trains are trialled with a distance of 5.8 kilometers, from Velodrome Station

PT LRT Jakarta CEO, Allan Tandiono disclosed that it is conducted with a limited number of passengers, which are 100 people by traveling the Velodrome Station, Rawamangun, East Jakarta to the Boulevard Utara Station in Kelapa Gading Mall, North Jakarta.

"Today two trains are trialed with a distance of 5.8 kilometers, from Velodrome Station, Rawamangun to Boulevard Utara Station, Kelapa Gading Mall," he stated, Wednesday (8/15).

LRT will Be Trialled on August 15

In its trial, the train is controlled by the machinists with a maximum speed of 40 kilometers per hour on a straight track and 25 kilometers per hour on a cornering track.

Linked News
Popular News indeks
  1. House Fire in Sunter Agung Successfully Extinguished

    access_time04-11-2026 remove_red_eye404 personAnita Karyati
  2. Faith Meets Progress, Ancol Prayer Gathering Fortifies Jakarta’s Journey as a Global City

    access_time01-11-2026 remove_red_eye402 personAnita Karyati
  3. Kampung Melayu Sports Facility Inaugurated to Tackle Brawls

    access_time06-11-2026 remove_red_eye399 personDessy Suciati
  4. Commission D Calls for Integrated Air Quality Monitoring System

    access_time06-11-2026 remove_red_eye383 personFakhrizal Fakhri
  5. Aid for Fire Survivors at Pinus Elok Flats Has Been Distributed

    access_time06-11-2026 remove_red_eye374 personNurito